Will any manufacturer ship 1 GW or more of perovskite solar modules in a single calendar year by December 31, 2030?
2
Ṁ100Ṁ212030
56%
chance
1H
6H
1D
1W
1M
ALL
This market resolves YES if any solar manufacturer has commercially shipped solar modules containing a perovskite absorber layer totaling 1 GW or more in a single calendar year on or before December 31, 2030.
YES if: Any company ships >=1,000 MW commercial perovskite or perovskite-silicon tandem modules (bankable warranties) in any calendar year 2026–2030 NO if: No manufacturer reaches 1 GW annual threshold by Dec 31, 2030. Research modules, pilots, or indoor PV without bankable warranties do not count.
Resolution sources (priority order):
NREL / IEA photovoltaic deployment tracking
LONGi, Oxford PV commercial shipment announcements
BloombergNEF perovskite commercialization tracker
PV Tech / PV Magazine annual technology deployment reports
This question is managed and resolved by Manifold.
Get
1,000 to start trading!
People are also trading
Related questions
1GW of solar power in Earth orbit by EOY 2031?
47% chance
Will any manufacturer ship 1 GW or more of perovskite solar modules in a single calendar year by December 31, 2028?
58% chance
Will any OEM be producing LLZO solid-state battery packs at commercial scale (≥1 GWh/year) by December 31, 2029?
80% chance
Will there be more than 1GW of in-space solar power generation by 2030?
42% chance
Will the world install >2.5 TW of solar panels in 2026?
7% chance
Will at least 80 percent of solar modules deployed in the US in 2026 be manufactured in the US?
12% chance
Will perovskite or silicon-peroskite pairs be the most common material for solar panels by 2030?
29% chance
Will global photovoltaic installations grow from 510 GW in 2023 to 8713 GW in 2030?
Will a utility-scale solar PPA be made for <$10/MWh by the end of 2026?
31% chance
Will total solar capacity exceed 6TW at the end of 2030?
92% chance